Draft environmental impact statement--South Project
Read Online
Share

Draft environmental impact statement--South Project

  • 230 Want to read
  • ·
  • 65 Currently reading

Published by United States Dept. of Agriculture, Forest Service in [Custer, SD] .
Written in English

Subjects:

  • Forest management -- Black Hills National Forest (S.D. and Wyo.),
  • Forest management -- South Dakota -- Custer County,
  • Forest reserves -- Fire management -- Black Hills National Forest (S.D. and Wyo.),
  • Forest reserves -- Fire management -- South Dakota -- Custer County,
  • Forest thinning -- Black Hills National Forest (S.D. and Wyo.),
  • Forest thinning -- South Dakota -- Custer County,
  • Environmental impact statements -- Black Hills National Forest (S.D. and Wyo.),
  • Environmental impact statements -- South Dakota -- Custer County

Book details:

Edition Notes

StatementHell Canyon Ranger District, Black Hills National Forest, Custer County, South Dakota.
ContributionsBlack Hills National Forest (Agency : U.S.). Hell Canyon Ranger District.
Classifications
LC ClassificationsSD428.B53 D73 2008
The Physical Object
Pagination1 v. (various pagings) :
ID Numbers
Open LibraryOL24093525M
LC Control Number2008377841

Download Draft environmental impact statement--South Project

PDF EPUB FB2 MOBI RTF

The Forest Service has prepared this Draft Environmental Impact Statement (Draft EIS) in compliance with NEPA and other relevant federal and state laws and regulations. This Draft EIS contains analyses consistent with NEPA, Council on Environmental Quality (CEQ) regulations, and Forest Service Size: 8MB. Draft Environmental Impact Statement (DEIS). Berry proposes to drill as many as new wells within the Project Area, which represents a full development scenario. The Project Area includes approximat acres and is located 11 miles south of Duchesne, Utah, in Township 6 South, Ranges 4 and 5 West. Get this book in print. AbeBooks; On Demand Books; Amazon; Find in a library; All sellers» Ocean Express Pipeline Project: Draft Environmental Impact Statement. Federal Energy Regulatory Commission, - Environmental impact statements. 0 Reviews. APPENDIX A CAP ALLOCATION DRAFT EIS BACKGROUND ASSUMPTIONS. A-4 ♦ Absent the Settlement Alternative, priority in case of shortage would be pursuant to the Secretary of the Interior’s (Secretary’s) water allocation decisions, the Master Repayment Contract and contracts for delivery of water to Indian Reservations.

As lead Federal Agency pursuant to the National Environmental Policy Act of U.S. DEPARTMENT OF THE AIR FORCE As a Cooperating Agency pursuant to 40 CFR §(a)(1) DRAFT ENVIRONMENTAL IMPACT STATEMENT PROPOSED AIRFIELD SAFETY ENHANCEMENT PROJECT Tucson International Airport Tucson, Pima County, . DRAFT ENVIRONMENTAL IMPACT STATEMENT COMMENT SUMMARY I‐5 Corridor Reinforcement Project Prepared for: Bonneville Power Administration P.O. Box Portland, OR ‐ Prepared by: EnviroIssues SW Fifth Ave, Suite Portland, OR September This Draft Environmental Impact Statement (DEIS) is being prepared to describe the potential environmental impacts and mitigation measures associated with the construction and operation of the proposed Alabama Ledge Wind Farm (the Project) as required under the New York State Environmental Quality Review Act (SEQRA) (6 NYCRR ). Draft Environmental Impact Statement San Juan Mine Deep Lease Extension Executive Summary ES-2 Therefore, in addition to the NEPA guidelines cited above, this Draft EIS has been prepared in accordance with the Court’s order .

Get this from a library! Draft environmental impact statement: Metropolitan Dade County rail rapid transit project. [United States. Urban Mass Transportation Administration.; Office of Transportation Administration, Miami, Fla.]. deliveries, river flows, and related environmental conditions in the study area. S.3 Intended Use of Environmental Impact Statement 37 The purpose of an Environmental Impact Statement (EIS) is not to recommend approval or rejection of a project, but to provide information to aid the public. ES-4 Draft – June Draft terms of reference for an environmental impact statement: South Burnett Coal Project - 2 - mitigation measures to avoid and minimise adverse impacts. The EIS should demonstrate that the project is based on sound environmental principles and practices. Attached is the draft environmental impact statement (draft EIS) for the Oroville Facilities, located on the Feather River in the foothills of the Sierra Nevada in Butte County, California. This draft EIS documents the view of governmental agencies, non-governmental organizations.